August 2016
![](https://www.bolducleroux.ca/wp-content/uploads/2016/08/actualité-echangeur-turcot-web-300x169.jpg)
Bolduc Leroux is involved in the rebuilding of the 50-year old Turcot Interchange in Montreal. It is one of the most used highway structure in Canada with more than 300,000 vehicles per day, a $3.7 billion dollars, it is a five years project planned to be completed in 2020.
This post is also available in Français.